Shortcut Navigation:

Pepco Union Faults Short-Staffing for Long Outages

Report by Metropolitan Washington Council, AFL-CIO assistant mobilizer Julia Kann of Union City.

Short-staffing at Pepco is as much to blame for the recent power outages as Mother Nature, according to the union that represents more than 1,000 Pepco workers.

“We’ve been complaining for years that staffing levels are too low,” Electrical Workers (IBEW) Local 1900 President Jim Griffin says.

Griffin testified Friday at the Council of the District of Columbia following a series of power outages that left more than 1 million area residents without power for as long as a week.

Griffin said:

Staffing, especially of linesmen, is half of what it was 20 years ago. These are the folks that are vital to keeping the lights on, and we’ve just been decimated.

Contract workers also have been a problem, Griffin said, noting that “they’re here today and gone tomorrow, leaving us to pick up the pieces.”

Local 1900 is in contract negotiations with Pepco. The current contract was set to expire May 31 but has been extended through midnight on July 29. 

The email address provided does not appear to be valid. Please check the address entered and try again.
>>
Thank you for signing up to receive our blog alerts. You will receive your first email shortly.
Tagged under:
DC Metro Council
IBEW
Pepco
power
Washington, DC
Login to comment Commenting Guidelines
comments powered by Disqus

Take Action

Sign the Pledge for a Road Map to Citizenship

Sign the pledge to fight for a common-sense immigration process that creates a road map to citizenship for aspiring Americans.

Click here »

Connect With Us

  • Facebook
  • Twitter
  • YouTube
  • Flickr
  • RSS

Are you a union member?


*Message and data rates may apply.

Facebook Favorites

Blogs

Join Us Online